/ Process

How we work

From the first enquiry to handover

  1. Step 1:Enquiry and estimate

    We go through the drawings, quantities and programme, propose systems and give a budget price.

    • 1.1 Drawing review
    • 1.2 Site visit
    • 1.3 System selection
    • 1.4 Budget price
    • 1.5 Programme
  2. Step 2:Design and engineering

    We build the 3D model of the façade, run the structural and wind calculations and issue shop and installation drawings.

    • 2.1 3D BIM modeling
    • 2.2 Structural analysis
    • 2.3 Shop and installation drawings
    • 2.4 Material specifications
    • 2.5 Client approval
  3. Step 3:Manufacturing

    At the Rzhev plant we machine the profiles on CNC centres, assemble and glaze the units and inspect them before dispatch.

    • 3.1 Material procurement
    • 3.2 CNC cutting & drilling
    • 3.3 Unit assembly
    • 3.4 Glazing
    • 3.5 Quality inspection
  4. Step 4:Logistics and delivery

    Components are packed and shipped in installation order, with deliveries agreed with the site.

    • 4.1 Packing and protection
    • 4.2 Transport planning
    • 4.3 Delivery schedule
    • 4.4 Site coordination
    • 4.5 Completeness checks

    Modules take their place

    Follow 224 façade modules as they are installed floor by floor on an illustrative eight-storey building. Transport stillages and the assembly sequence are shown together.

    Three-dimensional view of façade modules being installed on an illustrative eight-storey building: Structure and delivery Image tour
    01 / 09

    Structure and delivery

    The illustrative eight-storey structure is ready for installation. No façade module has been installed yet; modules are taken from transport stillages in assembly order.

    Drag to orbit · Scroll to zoom

    Illustrative system; dimensions and construction details are determined for each project.

  5. Step 5:Installation

    Our crews fix the brackets, frame, units and glazing under technical supervision.

    • 5.1 Setting out
    • 5.2 Bracket installation
    • 5.3 Frame and unit installation
    • 5.4 Sealing and interfaces
    • 5.5 Health and safety
  6. Step 6:Handover

    We close out snagging and hand over the as-built documents and warranties.

    • 6.1 Final inspection
    • 6.2 Snagging
    • 6.3 As-built documents
    • 6.4 Operation briefing
    • 6.5 Warranty handover
/ Production

The Rzhev plant

  • CNC machining centre
    CNC machining centre
  • Profile machining
    Profile machining
  • Sheet cutting
    Sheet cutting
  • Profile cutting
    Profile cutting
  • Cutting line
    Cutting line
  • Steel welding
    Steel welding
/ Technology

Engineering software

Tekla Structures
3D BIM Modeling
SAP2000
Structural analysis
SJ MEPLA
Glass Engineering
FLIXO
Thermal Analysis
/ Contact

Façade or roof quote

Send drawings or a bill of quantities and our engineers will prepare a quote.